Intelligent Engineering
Automation Platform

UI / UX Mockup Deck — v2.0 Enhanced

Version
2.0 Enhanced
Date
April 2026
Screens
15 screens
Status
Proposal
Dashboard
Design Guide
DFM Engine
Revision Intelligence
AI Co-Pilot
3D Unity Viewer
Knowledge Base
Design Review Sessions ★
Auto Knowledge Graph ★
Cost Estimation ★
External Portal ★
Mobile App ★
Customer Portal ★
Cross-Site R&D ★
Roadmap

Engineering operations dashboard

Real-time overview for engineering managers and leads

IEA Platform
Group · v2.0
Main
◉ Dashboard
◈ Projects
◧ Items
Core modules
Design guide
DFM engine
Revision intelligence
3D viewer
Knowledge base
New v2.0
Review sessions NEW
Knowledge graph NEW
Cost engine NEW
Mobile app NEW
Operations
Tasks
Audit log
Operations overview
Live
Active projects
14
3 with open DFM issues
DFM validations
87
This month
Effort saved
62%
vs manual baseline
Open tasks
23
8 high priority
Review sessions NEW
5
2 pending sign-off
Knowledge graph NEW
1,247
Nodes auto-captured
Recent activity
DFMP-4421 Rev C validated — 3 issues1h ago
ReviewDesign review session signed off2h ago
RevisionRev C vs B comparison complete3h ago
KGraph47 new knowledge nodes captured4h ago
NCRNCR-2024-0094 linked to DFM finding5h ago
Module usage this week
ModuleRunsAvg saved
DFM engine2447 min
Revision intelligence1832 min
AI co-pilot6112 min
Review sessions NEW965 min
Cost engine NEW1428 min
Open high-priority issues
PartIssueModuleAssignedStatus
P-5501Thin wall <0.8mm — linked to NCR-0091DFMS. PatelOpen
P-4421Bore tol. tightened — process riskRevisionJ. WongIn review
P-6001Undercut — cost impact: +18%Cost EngineR. KumarOpen

Projects

All active engineering projects, customers, and lead engineers

Projects
14 active
Filter
All projects
Active (14)
On hold (3)
Closed (47)
By customer
Customer A (6)
Customer B (3)
Customer C (2)
Internal R&D (3)
By lead
J. Wong (5)
S. Patel (4)
B. Hassan (3)
R. Kumar (2)
ProjectCustomerLeadActive partsStatusLast activity
SAT-2026-Q2 Customer A J. Wong P-6001, P-4421, P-5501 Active 1h ago
SAT-2026-Q1-FAI Customer A S. Patel P-4421 Batch 7 FAI approved 28 Mar
CB-PROTO-006 Customer B B. Hassan P-6210 Rev A Quote pending 3h ago
CB-2025-247 Customer B J. Wong P-3340, P-3341 Active Yesterday
RD-ALLOY-2026 Internal R&D R. Kumar Next-gen alloy study R&D Today
CC-2026-Q2 Customer C B. Hassan P-7710, P-7711 Active Yesterday
SAT-2025-Q4 Customer A S. Patel P-2200 family (4 parts) On hold 14 Mar
RD-DFM-RULES Internal R&D J. Wong R&D 2d ago
8 of 14 shown · show all

Items

Parts master — all parts under engineering management

Items
147 parts
Filter
All parts
In production (89)
In design (28)
Quoting (12)
Discontinued (18)
Material
316L stainless (62)
17-4 PH (24)
Aluminium 6061 (31)
Brass (18)
Other (12)
DFM status
Has high-severity (3)
Has medium (11)
All passed (133)
Part #DescriptionMaterialActive revCustomerDFMActivity
P-6001 Hydraulic manifold body 316L Rev A · v2 Customer A 3 issues 1h ago
P-4421 Sensor housing 316L Rev C · v3 Customer A 1 issue 3h ago
P-5501 Spindle bushing 316L Rev B · v1 Customer A All passed Yesterday
P-6210 Pneumatic actuator block 17-4 PH Rev A · v1 Customer B 1 issue 3h ago
P-3340 Gearbox shaft 17-4 PH Rev D · v4 Customer B All passed 2d ago
P-3341 Gearbox cover plate Aluminium 6061 Rev B · v2 Customer B All passed 2d ago
P-7710 Coupling sleeve Brass Rev A · v1 Customer C All passed Yesterday
P-2200 Valve stem (family) 316L Rev E · v5 Customer A All passed 14 Mar
A-2200 Valve assembly (4-part) Mixed Rev A · v1 Customer A Assembly 02 Apr
P-4422 Sensor housing (variant) 316L Rev A · v1 Customer A All passed 2023 case
10 of 147 shown · show all

Tasks

Engineering tasks assigned across the platform

Tasks
23 open · 8 high priority
Filter
My open tasks (7)
All open (23)
High priority (8)
Overdue (3)
Completed this week (12)
By source
DFM findings (9)
Review sign-off (5)
Customer portal (3)
NCR follow-up (4)
Knowledge decay (2)
By assignee
J. Wong (you) (7)
S. Patel (5)
B. Hassan (4)
R. Kumar (3)
D. Ng (Customer A) (2)
My open
7
2 high priority
Due this week
11
across team
Overdue
3
need attention
Avg time to close
2.4 d
last 30 days
TaskSourcePartAssignedPriorityDueStatus
Review undercut redesign on P-6001 Rev A DFM P-6001 J. Wong High Today Open
Sign-off DR-2024-041 — P-4421 Rev C Review P-4421 S. Patel High Tomorrow In review
Reply to Customer A — Rev C tolerance question Portal P-4421 J. Wong Medium Friday Open
Close NCR-2024-0094 — P-5501 thin wall NCR P-5501 S. Patel High 2d overdue Overdue
Update routing sheet — P-6001 bore to M-07 only DFM P-6001 B. Hassan Medium Wednesday Open
Re-validate SOP-QC-114 (2.3 yrs old) KGraph R. Kumar Medium Next week Open
FAI Batch 8 — schedule with Customer A Review P-4421 S. Patel Medium Next week Planned
Cost variance review — P-6210 quote Cost P-6210 R. Kumar Medium Friday Open
Confirm 5-axis capacity for P-6001 alternate route DFM P-6001 B. Hassan Low 2 weeks Open
9 of 23 open shown

Audit log

System activity log — all platform actions, retained for compliance

Audit log
Last 30 days
Time range
Last hour
Today
Last 7 days
Last 30 days
Custom range…
Action type
All actions
DFM runs (87)
CAD uploads (14)
Review sign-offs (12)
External shares (8)
Permission changes (3)
Auth events (28)
User
All users
J. Wong
S. Patel
B. Hassan
System (auto)
Retention: 7 years on-premise. All actions logged including user, IP, action, target, and outcome. Tamper-evident — entries are append-only and signed.
TimestampUserActionModuleTarget / Detail
14:32:14J. WongDFM runDFMP-6001 Rev A — 3 issues found
14:28:02S. PatelReview sign-offReviewDR-2024-041 — Approved
14:14:51J. WongCAD upload3DP-6001-Rev-A-v2.step (2.4 MB)
14:02:31SystemKnowledge node capturedKGraphAuto-captured from DFM run on P-6001
13:47:08D. Ng (ext)External accessPortalCustomer A · downloaded FAI-B7-P4421.pdf
13:31:55B. HassanNCR loggedNCRNCR-2024-0094 — P-5501 thin wall
12:58:22J. WongCo-pilot queryAI"Explain undercut on P-6001" — 3 sources cited
12:42:14SystemDocument sharePortalFAI-B7-P4421.pdf shared with Customer A
12:18:09S. PatelLoginAuthSSO via customer IdP · MFA verified
11:55:43R. KumarCost estimate generatedCostP-6210 · 100 pcs ·
11:32:01J. WongLive session started3DP-6001 Rev A · 3 participants
10:48:17SystemPermission changeAuthCustomer A · added access to A-2200 assembly
10:14:33B. HassanRevision comparedRevisionP-4421 Rev B → Rev C
09:42:18J. WongLoginAuthSSO via customer IdP · MFA verified
14 of 287 today · load earlier

Intelligent design guide

Guided 5-step feasibility workflow — pre-sales through engineering

Design guide
Guided feasibility
Steps
1 Requirements
2 Geometry
3 Material
4 Process constraints
5 Feasibility + cost
Project
P-6001 · Customer A
Prototype run · Phase 1
1
2
3
4
5
Step 4 — process constraints
Machining process
Machine available
Surface finish required
Batch quantity
Tightest tolerance
Inspection standard
AI constraint check: M-05 Cpk 1.18 for this bore tolerance — below 1.33 required. Recommend M-07. Ra 0.8 needs polishing pass.
Cost preview NEW: Estimated machining cost for 50 pcs: –5,100 (M-07, 316L, ±0.03mm bore). Removing undercut reduces this by ~12%. View cost breakdown
Inputs so far
P-6001 · Customer A
Bore Ø100, OD Ø140, 316L
Similar past jobs
P-4421 Rev C
316L · M-07 · 2024 ·
Successful
P-4422 Rev B
316L · M-07 · 2023 ·
NCR raised

Intelligent DFM engine

Automated manufacturability — with machine-specific Cpk routing and NCR linkage

DFM engine
Automated manufacturability
Queue
P-6001 Rev A 3 issues
P-4421 Rev C
P-5501 Rev B 1 issue
Rules library
Wall thickness rules
Undercut detection
Tolerance / Cpk rules ENHANCED
NCR linkage NEW
Part:
Initialising…
Analysing geometry against 14 manufacturability rules
✓ Re-run complete. Undercut redesign accepted. Issue resolved — high-severity count reduced. Cost saving: /batch confirmed.
DFM report — P-6001 Rev A
3 issues found · 11 passed · 316L · 14 rules checked
3 issues11 passed
Enhanced in v2.0 ENHANCED: DFM results now include a colour heatmap on the 3D model surface (green/amber/red continuous gradient), machine-specific Cpk routing, and automatic NCR linkage when issues reach production.
High — undercut geometry at inner profile
Cannot machine
12° undercut at Z-45mm unreachable with standard turning tools on M-07 or M-05. Recommend relief groove (see Case-2023-041). Cost impact if redesigned: −12% ( saving per batch).
Rule: UC-001Zone: inner bore Z-45Cost delta: −
High — wall thickness below 0.8mm
Rework risk
Rib at face B: 0.62mm — below minimum 0.8mm for 316L. Chatter and deflection risk.
Rule: WT-003Zone: face B ribAuto-linked to NCR when in production
Medium — bore ±0.03mm tolerance
Machine routing required
Bore tolerance ±0.03mm requires Cpk ≥ 1.33. M-05 Cpk = 1.18 (not suitable). M-07 Cpk = 1.48 (approved).
Rule: TOL-007M-05: Cpk 1.18 ✗M-07: Cpk 1.48 ✓Cpk routing
Passed checks (11)
Min feature sizePass
Material machinability indexPass
OD tolerance vs Cpk (M-07)Pass
Thread standard conformancePass
AI recommendations
Redesign undercut
Add 0.5mm relief groove. Saves /batch. See Case-2023-041.
Implementation: 0.5mm radius groove relieves the 12° undercut. Tool path becomes accessible to M-07 standard tooling. Geometry change is non-functional. Customer A approved a comparable change on P-4422 in 2 working days. Net saving: /batch on a 50-piece run, ~ K/year at current volume.
Route bore to M-07 only NEW
Cpk 1.48 on M-07 vs 1.18 on M-05. Update routing sheet.
M-07 (Mazak Integrex) holds Cpk 1.48 on Ø100 ±0.03mm based on last 60 parts (Jan–Mar 2024). M-05 measures Cpk 1.18, below the 1.33 threshold for critical features. Action: update P-6001 routing sheet to M-07 only for this operation. SPC chart available in process documentation.
Thicken rib to 1.0mm
Minimal geometry change. Re-run DFM after.
Rib at face B currently 0.62mm. Increase to 1.0mm (within design intent). Eliminates chatter risk on 316L finishing pass. Re-run DFM after CAD update to confirm pass. Estimated impact: zero functional change, minor mass increase (~2g per part).
Proactive lessons NEW
Auto-surfaced: 3 relevant past cases found without searching
Case-2023-041 — undercut fix
P-4422 · Relief groove · Resolved Rev B
NCR-2023-0041 — thin wall
P-5501 · Wall 0.62mm · CAPA closed

Drawing revision intelligence

Automated change detection with impact flags

Revision intelligence
Change detection
Comparisons
P-4421 Rev B → Rev C
P-5501 Rev A → Rev B
P-6001 Rev A → Rev B
P-4421 — Rev B → Rev C change report
Rev BRev C
AI summary: Rev C tightens bore diameter by 40%, updates face A surface finish to Ra 0.8, and adds a post-cooldown inspection note. No geometry or material changes. Process and QC updates required before production.
Change table
FieldRev BRev CImpact
Bore diameter tolerance±0.05mm±0.03mmTightened
Face A surface finishRa 1.6Ra 0.8Tightened
Inspection noteNonePost-cooldown checkAdded
Material316L ASTM A276316L ASTM A276Unchanged
Process impact flags
Machining
Bore tol. tightened 40%. Route to M-07. Verify Cpk.
QC checklist
Add 2hr cooldown hold per SOP-QC-114.
Finishing
Ra 0.8 may need extra polishing pass on face A.

AI engineering co-pilot

Grounded in approved internal documents — always cites sources

AI co-pilot
Decision support
Conversations
P-6001 DFM issues
316L tolerance history
FAI report Batch 7
Quick actions
Summarise report
Explain DFM result
Draft NCR response
Proactive lessons NEW
P-6001 — DFM discussionP-60013 open
Proactive lessons surfaced NEW: 3 relevant past cases auto-found — Case-2023-041 (undercut fix), NCR-2023-0041 (thin wall), SOP-MACH-007 (5-axis). No search needed.
JW
Explain the undercut issue on P-6001 and what similar cases we've had.
AI
The undercut at Z-45mm on P-6001 Rev A is a 12° inner profile unreachable with standard turning tools on M-07 or M-05. DFM-UC-001

We had the same issue on P-4422 Rev A in 2023. Resolution: 0.5mm relief groove — no functional impact. Customer A approved in 2 working days. Cost saving: /batch. Case-2023-041
Case-2023-041
P-4422 · undercut resolved
DFM rule UC-001
Undercut detection spec
JW
Draft a customer-ready explanation for why this geometry is hard to machine.
AI
Draft — review before sending

"The current inner profile at Z-45mm includes an undercut angle preventing access with standard CNC turning tools. We recommend a minor geometry revision — adding a small relief groove — which would fully resolve this constraint with no impact on part function, and reduce unit cost by approximately 12%."
Sources cited
DFM report — P-6001
Rule UC-001 · today
DFM
Case-2023-041
P-4422 undercut fix
Knowledge

3D viewer ENHANCED

Asset management · version compare · live collaboration · DFM heatmap · measurement

CAD assets
▾ P-6001 3 issues
STEP·2 versions
Rev A · v2latest
Rev A · v128 Mar
▸ P-4421 1 issue
STEP·3 versions
Rev C · v3latest
Rev B · v214 Feb
Rev A · v104 Jan
▸ P-5501 Pass
STEP·1 version
Rev B · v121 Mar
▸ A-2200 (assembly)
STEP-AP242·4 parts
Rev A · v102 Apr
Total: 4 assets · 7 versions · 12.4 MB
P-6001 Rev A · v2 3 DFM issues
! Undercut ! Thin wall ! Deep hole High Med OK Heatmap Z X Y Unity WebGL · Continuous DFM heatmap overlay
?
Viewer controls
  • Drag rotate
  • Right-drag pan
  • Scroll zoom in/out
  • Double-tap recenter
  • 1/2/3 camera views
  • F fullscreen
  • M measure tool
Touch: pinch to zoom, two-finger drag to pan
View: P-6001-Rev-A-v2.step · 2.4 MB · uploaded by J. Wong · 28 Mar
Tree
Meta
Collab
Color
P-6001 Rev A
Outer body
Inner boreDFM
Face B ribDFM
Top holes ×3
M8 threads ×4
Chamfers
7 components · click ● to hide / show
Selected: inner bore
DiameterØ100mm
Tolerance±0.03mm
Heatmap● High
DFM: High severity
12° undercut — cannot machine standard.
File
NameP-6001-Rev-A-v2.step
TypeSTEP AP242
Size2.4 MB
Versionv2 (latest)
Uploaded byJ. Wong
Uploaded28 Mar 2026 09:14
Part properties
Drawing no.DRW-6001-A
Material316L stainless
Mass1.84 kg
Bounding box140 × 140 × 130 mm
Volume232 cm³
Surface area487 cm²
Custom fields
CustomerCustomer A
Project codeSAT-2026-Q2
Surface finishRa 0.8 (face A)
Heat treatmentSolution annealed
InspectionISO 2768 medium
Custom field schema is fixed — defined at platform configuration.
Currently in session
No active session.
Recent sessions
JW
P-6001 Rev A review
3 participants · 24 min · 28 Mar
SP
P-4421 Rev C handoff
2 participants · 18 min · 26 Mar
BH
A-2200 assembly walkthrough
5 participants · 41 min · 22 Mar
Available reviewers
SP
S. Patel
QA · HQ
● Online
BH
B. Hassan
Process eng · Johor
● Online
RK
R. Kumar
Cost · HQ
Offline
Active rules
Material: 316L
Stainless steel parts
Material: Brass / bronze
Bushings, bearings
Function: Fastener
Screws, bolts, threads
Function: Sealing
O-rings, gaskets
DFM: High severity
Override colour rule
Rules apply on upload. Click any swatch to edit. Switch to Manual to recolour individual parts.

Knowledge base

Centralised engineering repository with semantic search

Knowledge base
Categories
All knowledge
SOPs & work instructions
Past cases & NCRs
DFM rules library
Material specs
5 results · semantic search across 1,847 documents
Case-2023-041 — P-4422 undercut resolution
12° undercut resolved by adding 0.5mm relief groove. No functional impact. Customer A approved in 2 working days.
CaseP-4422316L
97%
DFM rule UC-001 — undercut detection
Detects inner profile undercuts exceeding 5° unreachable with standard turning tooling. Flags high severity.
DFM ruleGeometry
92%
SOP-MACH-007 — 5-axis setup for complex geometry
Work instruction for M-09 (5-axis) for parts with undercuts or compound angles.
SOP5-axisM-09
85%

Design review sessions NEW

Structured virtual review with sign-off, auto-minutes, and knowledge capture — closes the gap

New in v2.0: Formal design review sessions with structured issue tracking, real-time + async markup, digital sign-off workflow, and auto-generated meeting minutes. Every decision is automatically captured into the knowledge graph.
Review sessions
Structured approvals
Active sessions
P-4421 Rev C — QA review 3 open
P-6001 DFM review Signed off
FAI — Batch 7
Actions
+ New session
Review templates
P-4421 Rev C — QA design review
Session #DR-2024-041 · Initiated by J. Wong · 11 Apr 2024
In progress
1
Agenda set
Done
2
Files shared
Done
3
Review & markup
Active
4
Resolve issues
Pending
5
Sign-off
Pending
Session issues — open comments
BH
B. Hassan — Johor ManufacturingOpenProcess concern
Bore tolerance ±0.03mm — M-05 Cpk is 1.18, below required 1.33. Need to discuss or route to M-07 only.
AI
AI co-pilot — auto-drafted replyAUTO-DRAFT
Per Cpk data, M-07 holds 1.48 for this tolerance. Recommend routing all P-4421 bore ops to M-07. Updating routing sheet.
SP
S. Patel — QA EngineerPending
Ra 0.8 on face A — confirm polishing pass is in setup sheet before sign-off.
DN
D. Ng — Customer A (External)Awaiting
Confirm measurement method and calibration reference for bore and OD.
Reviewers & sign-off status
ReviewerOrganisationRoleStatus
JW
J. Wong
HQOriginatorApproved
SP
S. Patel
HQ — QAQA reviewerIn review
BH
B. Hassan
Johor MfgProcess eng.Query raised
DN
D. Ng
Customer AExternal QCNot started
Session details
Agenda
1. Bore tolerance sign-off
2. Surface finish confirmation
3. Customer measurement query
Files attached
Drawing P-4421 Rev C.pdf
DFM report Rev C.pdf
Auto-minutes preview NEW
Auto-generated on session close: attendees, all comments, decisions, action items, and sign-off status — exported as PDF.
Knowledge capture NEW
All decisions in this session will be auto-added to the knowledge graph on close. 4 new nodes estimated.

Auto knowledge graph NEW

Passively captures every DFM run, review session, and co-pilot decision — no manual effort

New in v2.0: Every engineering activity in IEA automatically populates this knowledge graph. No engineer needs to manually log a lesson — the system captures it from DFM results, revision comparisons, review sessions, and co-pilot Q&A.
Knowledge graph
Auto-built from all activity
Sources
All sources
From DFM runs
From review sessions
From revision comparisons
From co-pilot sessions
Filters
By part family
By process
By engineer
⚠ Decay alerts (3)
Total nodes
1,247
Auto-captured
From DFM runs
412
Issues + resolutions
From reviews
389
Decisions + sign-offs
From co-pilot
446
Q&A pairs
Decay alerts
3
Nodes >2 years old
Recent auto-captures
SourceNode capturedTime
DFMUndercut → relief groove fix · P-60011h ago
ReviewM-07 routing decision for ±0.03mm bore2h ago
RevisionRa 0.8 polishing pass requirement — P-44213h ago
Co-pilotCustomer explanation template — DFM undercut4h ago
Proactive surfacing — lessons at review time NEW
When a DFM run or review session opens, the 3 most relevant knowledge nodes are shown automatically — without the engineer searching.
Triggered bySurfaced lessonRelevance
DFM: undercut detectedRelief groove fix — P-442296%
DFM: thin wallCAPA wall thickness — P-550191%
Review: bore toleranceM-07 Cpk 1.48 routing decision89%
Knowledge decay alerts 3 items need review
NodeAgeLast validatedAction
SOP-QC-114 tolerance hold time2.3 yearsJan 2022
M-05 Cpk baseline for bore ±0.05mm2.1 yearsMar 2022
316L machinability index — Tool life2.0 yearsApr 2022

Cost estimation engine NEW

Rough machining cost from own ERP data — shown alongside DFM results

New in v2.0: Closes the gap vs which shows instant cost estimates with DFM. IEA's cost engine uses own ERP data — not generic market rates — making it accurate for specific machines, materials, and processes.
Cost engine
ERP-linked estimation
Recent estimates
P-6001 Rev A · 50 pcs
P-4421 Rev C · 100 pcs
P-5501 Rev B · 25 pcs
Settings
Machine rates (ERP)
Material costs (ERP)
Setup time library
P-6001 Rev A — cost estimate
50 pcs · 316L · M-07 (Mazak) · ±0.03mm bore · Ra 0.8 face A
Total estimate
For 50 pcs (±15%)
Unit cost
Per piece
Machine hours
18.5 hr
M-07 @ /hr
Similar past job
P-4421 · 50 pcs · 2024
Cost breakdown
ComponentHours/QtyRateCost (S$)
Material (316L bar)8.5 kg /kg722
Turning (M-07)12.0 hr /hr2,160
Milling (M-07)4.5 hr /hr810
Polishing (Ra 0.8)2.0 hr /hr180
Setup & fixturing1× batch flat320
Inspection (CMM)2.5 hr /hr250
Total (50 pcs)4,442
Scenario comparison — DFM fixes click to apply
ScenarioΔ CostΔ Time
Current (with undercut) Baseline
Fix undercut (relief groove) (−11%) −2.5 hr
Use 5-axis (M-09) instead (+15%) +3.0 hr
Relax bore to ±0.05mm (−7%) −1.5 hr
Recommendation: Fixing the undercut saves /batch (11%) and removes the highest-severity DFM issue. Optimal scenario.

Customer portal NEW

Secure external collaboration with customers — shared threads, drawing approvals, document firewall

External portal
Precision Co. → Customer A
Active projects
Batch 7 — P-4421
Batch 6 — P-5501
Prototype — P-6001
Documents shared
Drawing approvals
FAI reports
CoC / material certs
Delivery schedule
Batch 7 — P-4421 shared threadCustomer AActive
CA
Customer A — D. Ng · 09:14
Can you confirm Rev C approval and share the updated FAI report for Batch 7? Need it for our incoming QC by Friday.
JW
J. Wong · 09:31
Hi David — Rev C approved 28 Mar. FAI report and CoC attached below.
FAI-B7-P4421.pdfCoC-316L-Batch7.pdf
CA
Customer A — D. Ng · 10:02
Bore tolerance changed ±0.05 → ±0.03 in Rev C. Can you confirm your Cpk supports this?
AI
AI draft (review before sending) AUTO-DRAFT
M-07 Cpk = 1.48 for ±0.03mm bore (last 60 parts, Jan–Mar 2024), above 1.33 threshold. SPC chart available on request.
Shared with customer
Drawing P-4421 Rev C
Approved · 28 Mar
Shared
FAI report — Batch 7
Shared today
Shared
Blocked — document firewall NEW
Internal NCR-2024-0087
Auto-blocked — internal only
Restricted
SPC data — M-07
Pending approval to share
Pending

Cross-site R&D workspace NEW

Multi-site collaboration across HQ Singapore, Munich R&D, Johor Manufacturing, Osaka (observer)

R&D workspace
Cross-site collaboration
Sites
HQ — Singapore
R&D — Munich
Manufacturing — Johor
Lab — Osaka (observer)
Projects
Next-gen alloy — P-6001
Surface coating study
Next-gen alloy study — P-6001
R&D3 sites active
Experiments
48
Across 3 sites
Open questions
7
2 awaiting Munich
Cross-site docs
14
Shared
Site contributions
SiteExperimentsLatest
HQ — SG
18Today
Munich
22Yesterday
Johor
82d ago
Osaka
ObserverRead-only
Open questions
QuestionFromStatus
Optimal annealing temp — variant 3?HQAwaiting Munich
Ra 0.4 feasible after coating?MunichIn progress
Machinability vs 316L?JohorAnswered
AI synthesis — cross-site summary NEW
AI synthesis · updated 2h ago · based on 31 shared documents across 3 sites
Munich's annealing trials (Exp 19–22) show variant 3 achieves optimal hardness at 1,080°C for 45 min, outperforming variant 1 by 12% on tensile strength. HQ machining data confirms higher tool wear rate — Johor should validate with CNC setup before committing to production parameters.
Munich Exp-22.pdfHQ machining log AprAlloy variant 3 spec
Recent cross-site messages
MN
Munich — M. Neuer · 08:40
Exp-22 results uploaded. Variant 3 — Vickers 310 HV.
JW
HQ — J. Wong · 09:15
Tool life drops ~18% vs 316L — factor into cost model.
RK
Johor — R. Kumar · 10:02
Can we get variant 3 parameter sheet? Setting up CNC trial this week.

Mobile app — shop floor NEW

AI co-pilot, DFM access, and NCR logging for production engineers on the floor

New in v2.0: React Native mobile app for iOS and Android. Neither nor offer this. Designed for production engineers who need AI intelligence on the shop floor — not just at a desk.
AI Co-Pilot
IEA MobileJ. Wong ●
What SOP do I use for the current P-4421 job?
Use SOP-MACH-022 Rev 3 for P-4421 turning. Key note: bore inspection requires 2hr cooldown hold per SOP-QC-114 §3.2.
Is there a DFM concern I should know about?
Yes — Rev C bore tolerance ±0.03mm. Route to M-07 only (Cpk 1.48). Do not use M-05 for this job.
AI co-pilot on the floor
Log NCR NEW
New NCRCancel
Part number
P-4421
Issue type
Dimension out of spec
Description
Bore Ø100 measured 0.04mm over tolerance after cooldown…
Photo
📷 Tap to attach
Submit NCR
NCR logging from the floor
Notifications NEW
IEA — Notifications
DFM issue — P-6001
Undercut detected at Z-45mm. Action needed before production.
2 min ago
Drawing updated — P-4421 Rev C
Bore tolerance tightened to ±0.03mm. Use M-07 only.
1h ago
Review session — sign-off needed
DR-2024-041: P-4421 Rev C awaiting your approval.
3h ago
NCR closed — P-5501
NCR-2024-0091 resolved. CAPA-2024-008 verified closed.
Yesterday
Push alerts for DFM, revisions, approvals

Implementation roadmap v2.0

18 months · 5 phases · 9 enhancements incorporated

Total phases
5
18 months total
New modules added
5
vs SRD v1.5
Build cost (v2.0)
K
+ K for enhancements
After 50% EDG grant
~ K
Net client cost
5-yr ROI (with grant)
230%+
Mid scenario
Phase timeline
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18
Phase 1Active
Foundation
AI co-pilot, knowledge base, search, RBAC, dashboard, knowledge graph scaffolding
Months 1–3 · K
Phase 2Up next
Revision + Review
Revision intelligence, review sessions, sign-off workflow, auto-minutes NEW
Months 4–6 · K
Phase 3Planned
DFM + External
DFM engine, heatmap, Cpk routing, NCR linkage, external portal NEW
Months 7–10 · K
Phase 4Planned
Advanced AI
Knowledge graph, cost engine, ERP/PLM integration, mobile app NEW
Months 11–14 · K
Phase 5Planned
3D + Digital Twin
Unity 3D viewer, DFM heatmap overlay, digital twin foundation ENHANCED
Months 15–18 · K
9 enhancements — summary
#EnhancementPhaseCloses gap vsType
1Auto knowledge graph (passive capture)4NEW
2Design review sessions with sign-off2NEW
3DFM colour heatmap on 3D model surface3+5ENHANCED
4Proactive lessons learned surfacing4NEW
5Cost estimation engine (ERP-linked)4NEW
6External collaboration portal3NEW
7Machine-specific Cpk routing in DFM3NEW
8NCR auto-linkage to DFM findings3NEW
9Mobile app — shop floor AI + NCR4NEW